MINING TURKEY 2014, 6th International Mining, Mining Machinery, Equipment and Construction Vehicles Fair is regarded as one of the extensive event on Mining, Mining Machinery, Mining equipment and Construction Vehicles areas.
The SETABRAN grinding Project was a showcase for GSZ’s capabilities beyond mineral processing and specially in grinding plants. GSZ designed all the services and infrastructure to support the expanded mining fleet, projected to become one of the largest on the continent.
The SETABRAN grinding Project was a showcase for GSZ’s capabilities beyond mineral processing and specially in grinding plants. GSZ designed all the services and infrastructure to support the expanded mining fleet, projected to become one of the largest on the continent. The company has consequently cemented its position as a one-stop-shop service provider.
SETABRAN Mining and Industrial Company is active in non-metal and hard mineral micronizing and providing area that are used in glass, tile, ceramic, enamels, chines utensil industries and other industries. This company is unique among credit consumer industries and in this regard, a development plan in 2000 to increase production, is updated to run. This powdering circuit that has been designed and manufactured by GSZ Company is one of this companies featured works. Grinding equipment used in this plant has been designed to make company with annual production capacity that is amount of 120 thousand tons of hard and soft powder micronized consists of quartz, feldspar, kaolin, calcium carbonate, dolomite etc. that can be in various types of mesh and aggregation.
insensitivity to flow variations, insensitivity to temperature variations, small plant volume, virtually no water loss, high total solids content of separated sludge, very high degree of separation even for very small particles, simple operation, High process capacity, low operating cost and fast payback of investments are the main reasons make flotation method as a most economical mineral processing method. In this regard, ILZIMCC (IRAN lead and zinc industries and mines cooperative company) decided to use concentration method to produce lead and zinc concentrate appropriate to use in subcontractor companies to reduce operating costs of leaching process to eliminate distracting elements.
ILZIMCC has stablished to process 250,000 ton material per year, GSZ’s team carried out a complete range of primary study like mineralogical study, and flotation tests to determine ability of mineral to recovery lead and zinc sulfide and oxide ore by cumulative or diffractive methods in lab and pilot scale. All of the feasibility studies by new methods and low equipment cost with all of simulation andStrength Analysis and calculation was a big advantage of process to make responsibility to achieve optimum single-point. Designed ball mill special shape for this company has a beneficiation to simplify grinding control with high insurance level.
Making modular heavy media separation plant carried out by complete study inreliable subcontractor laboratory
Due to the base metal projects development (in particular zinc), the potential benefits of increasing the plant throughput by pre-concentration using dense medium separation(DMS) are becoming increasingly evident. This has led to a number of pre-feasibility studies being carried out on both new deposits as well as existing plants. The SADID ROOY company was one of subjected plants that needed to increase the plant throughput and reducing made concentrate TC by pre-concentrating of feed material to the leaching process when there was no lead in material or to the flotation for lead and zinc material. Reducing acid usage in leaching process by pre-concentration of material was the main reason in despite of other benefits that led us to define this project.
Making modular heavy media separation plant carried out by complete study in reliable subcontractor laboratory and examples took from a number of lead and zinc ores from Angouran mine were subjected to detailed densiometric analysis over a wide range of densities (2.6 to 4.2g/cc) at various top sizes.Computer based simulation programs were used to predict the practical operating performance of the plant without having to pursue costly pilot plant test work. Most part of Angouran mine material was a dilution rocks with high gravity difference from main mineral that increased lead and zinc mineral recovery more than before. Designed Modular HMS plant capacity was 200,000 ton per year by feed particle size from 0.5to 20mm that can process in this plant that was subjected to washing, slime eliminating.